vertical turbine pump
vertical turbine pump
vertical turbine pump
vertical turbine pump
vertical turbine pump
vertical turbine pump
vertical turbine pump
Vertical wet pit pump
vertical turbine pump
vertical turbine pump
vertical turbine pump
vertical turbine pump
vertical turbine pump
vertical turbine pump
vertical turbine pump
vertical turbine pump
vertical turbine pump
vertical sump pump
vertical sump pump
vertical sump pump
vertical sump pump
Right Angle Gearboxes
Right Angle Gearboxes
Right Angle Gearboxes

Current Location: HOME /Knowledge /vertical turbine pump

Starting of vertical long axis turbine pumps

Date:2022/5/16 21:46:52Clicks:

Starting of vertical long axis turbine pumps


(1) Close the outlet gate valve and pressure gauge cock, and connect the cooling and lubricating water of vertical long axis turbine pumps.

(2) Check the flow rate and pressure of cooling and lubricating water. If the flow rate and pressure of cooling and lubricating water are not satisfied, the Starting of vertical long axis turbine pump is not allowed to start.

(3) Start the motor after the flow and pressure of the vertical long-axis pump meet the requirement and the water supply is more than 3 minutes. When the pump reaches the normal speed, open the pressure gauge cock, gradually open the gate valve in the outlet pipe, and adjust to the required working conditions. When the gate valve of the outlet pipe is closed, the continuous working time of the vertical long axis pump shall not exceed 2 minutes.

(4) If Starting of vertical long axis turbine pumps is sealed with packing, tighten the pressing nut on the packing cover evenly, so that the liquid leaks out in droplets, and pay attention to the temperature rise in the packing chamber.


Be careful:

1. In any case, the pump can not operate for a long time when the outlet gate valve is closed. Otherwise, it will cause pump vibration or even transport liquid vaporization, which may cause equipment damage and personal injury.

2. Packing cover should not be pressed too tightly. A small amount of leakage can lubricate the packing. Stopping leakage will cause packing burns and shaft bushing scratches.

3. When transporting sewage, guide bearings must pass cooling and lubricating water. The insufficient flow rate and pressure of cooling and lubricating water will seriously affect the service life of the pump. It takes more than 3 minutes to pass through the water before starting, and then turn off the cooling water after the pump stops turning completely.

4. When transporting clean water, the guide bearing can not pass cooling and lubricating water, but the protective pipe must be cancelled.

 

Starting of vertical long axis turbine pumps


Scan and add WeChat

TEL:

008618507312158 Xiangyin Industrial Park, Jinlong Town, Xiangyin County, Hunan Province, China susie@hnljpump.com
Copyright 2004-2024 Hunan Perfect Industry Co., ltd  Case Number:湘ICP备2023000934号  China Vertical Turbine Pump Manufacturers